Technical Sheet

_
DénominationShariket Tahliyat Miyah Mostaganem (STMM Spa)
LocalisationPlage chelif, wilaya de Mostaganem.
Creation07 june 2006.
Investment227,1 Million USD.
Projet typeSeawater desalination plant.
ProcessReverse osmosis.
FundingEquity 20% 45.4 MUSD Bank loan (BEA) 80% 181.7 MUSD
Factory operatorINIMA MEDIO AMBIENTE, S.A., Y AQUALIA GESTION INTEGRAL DEL AGUA, S.A., UNIÓN TEMPORAL DE EMPRESAS.
Commissioning27 september 2011.
Production journalière200 000 m³.
Cumulative water production at the end of May 2021342 111 567 m³.